无码高清视频|成人自拍视频|欧美成人午夜无码A片秀色直播|草美女视频网站|美女被操网站在线观看

多項選擇題

You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?()

A. The TESTKING VLAN must be created.
B. The desired ports must be added to the new TESTKING VLAN.
C. The TESTKING VLAN must be added to all of the domains.
D. The TESTKING VLAN must be named.
E. An IP address must be configured for the TESTKING VLAN.
F. None of the above. VLAN creations are automatic.

微信掃碼免費搜題