无码高清视频|成人自拍视频|欧美成人午夜无码A片秀色直播|草美女视频网站|美女被操网站在线观看

單項選擇題

Users have been complaining that their Frame Relay connection to the corporate site is very slow. The network administrator suspects that the link is overloaded. Based on the partial output of the Router# show frame relay pvc command shown in the graphic, which output value indicates to the local router that traffic sent to the corporate site is experiencing congestion?()

A. DLCI = 100
B. last time PVC status changed 00:25:40
C. in BECN packets 192
D. in FECN packets 147
E. in DE packets 0

微信掃碼免費搜題